As I was getting started with my 2X, I found ( @45 seconds of this video) the rods were not fully engaged into the bodies.during this process, I also ‘cracked loose’ all the structural screws on the main box itself.If the box is tilted and or out of alignments during initial assembly, nothing will line up properly. My square that I use is verified @ .0004" in 8", so that’s plenty accurate. I uset the square directly on the base plate, and checked all the verticals, and sequencially tightened ( like an engine block/ head tightening process, inspecting each vertical as went along. when that is complete, then move to the gantry duties. on my marvin pics I have my first bahamut print, @ .2 res to compare.

Anybody have a source for an Aluminum Extruder Block upgrade for a Rep 2X (I need left and right)? The place on eBay where I got them for my Rep 2 seems to have gone offline. If you have a better suggestion for the 2X I would love to hear your experiences.

This is the one I had wanted (scroll down on the listing)

http://www.ebay.com/itm/111566069212 29

Thanks!